Wednesday, 2 April 2014

construction work – pig house

A couple of things needed to be fixed at the pig houses. On one we had to extend a veranda for the water would not go in during the rain season. Then we had to seal the bamboo walls with transparent tarpaulin so the rain and wind would be blocked a bit. For some reason the pigs and also the piglets love plastic stuff. They would keep trying to get pieces of plastic while we were busy attaching them to the walls. When we had finished our job we realised that the piglets already bit some holes in the freshly mounted tarpaulin. Claudia then attached some wired mesh to hinder them from doing that. In the meantime the building workers constructed another veranda and a round platform that fits a drum to collect more rain water at the other pig house. For some reason Simon, the master builder seemed to be a bit angry… We soon realized that one could not close the door to enter the pig house any more for the new veranda was simply built too large… Simon would later move the door a bit so it would work again…

Fixing the pig house – Check!

 

building a veranda with local bricksIMG_1693

mixing the cementIMG_1696

filling up the veranda with cementIMG_1701

a close up of the verandaIMG_1702

Charles and I then attached some plastic tarpaulin to protect the pigs from the rain and windIMG_1744

nice job…
DSC_1492

also on that sideDSC_1494

but then the piglets started to eating the tarpaulin so we had to attach some wire netting…IMG_1747

Meanwhile the building workers had to build another veranda and a round platform for
another water drumIMG_1734

the drum fits perfectlyIMG_1739

but, what’s that? The door can’t be closed anymore…IMG_1740

They built the veranda just a bit too long… so they’ll have to shift the door a bit later on…IMG_1738

No comments:

Post a Comment